South End Renovation
This South End duplex renovation included interior demolition, structural removal of masonry walls, floors and 12" of soil to achieve the modified room layouts and increased ceiling heights throughout the space. Work included all new underground plumbing, new concrete slab on grade, structural beams, new framing with 3 coat plaster system wall finish. The finish details start with the custom milled hard maple cabinetry, wall paneling and trim to the etched bathroom floor and import ceramic glazed shower tile.    
Architecture: Pauli & Uribe
Photography: Eric Roth      